Ecology rulemaking update: WAC 173-182

Ecology’s rewrite of the oil spill contingency plan rule, WAC 173-182, is between drafts. The second preliminary draft came out on August 19. The informal comment period on it closed October 30, and Ecology is now working through what it received.

The next step is the formal proposal, called the CR-102. Ecology’s posted schedule puts that in spring 2027, with public hearings the same season, adoption in summer 2027 and an effective date in fall 2027. Ecology describes those dates as anticipated and subject to change.

What the August draft added

The May draft left out the drill sections and the Columbia River standard. The August draft includes both, and Ecology’s overview table now lists changes in more than 50 sections of the chapter. The items most likely to matter to members:

•     Drills (-700, -710, -720, -730). Plan holders that handle oils that may sink would deploy for a non-floating oil scenario at least once every three years. A new wildlife deterrence deployment drill would also be required once every three years, scheduled at least 90 days ahead.

•     John Day Dam staging area (new -440). Covered vessels and facilities operating on the Columbia between river mile 190 and 270 would meet tiered boom, recovery and storage standards at 4, 6, 12, 24 and 48 hours. The draft allows 12 months to comply.

•     Aerial surveillance (-320, -321). The separate facility section is repealed and folded into one standard for all plan holders. At the 12-hour tier, one of the two remote sensing systems would have to be a high-definition mounted infrared camera.

•     Non-floating oil technical manuals (-349). Required for plan holders that handle non-floating oil, due six months after the rule takes effect.

•     Shoreline cleanup (-522). Each plan would describe its shoreline response program and name qualified people to run it, including a SCAT coordinator, field team manager and data manager.

•     Documenting compliance (-350). Revised again from the May draft.

•     Vessel umbrella plans (-232) and the Neah Bay staging area (-395). Listed by Ecology as clarifying edits.

•     Phase-in (-130). Six months for non-floating oil manuals and 12 months for most other updates.

•     Housekeeping. Fax and paper submittals are removed, the spill management team section (-280) is restructured, and the noncompliance sections are consolidated at -910.

The rail chapter, WAC 173-186, carries parallel changes.

What WSMC has filed

WSMC took part in all four Best Achievable Protection workgroups and has commented in writing at each stage.

•     April 2026. Five letters: whale deterrence, uncrewed aircraft and aerial surveillance, the drill program (-710), technical manuals (-349), and the workgroup process.

•     June 2026. Detailed comments on documenting compliance (-350) and aerial surveillance (-321).

If you’d like a copy of anything WSMC has filed, ask me.

What changes when the proposal is filed

So far everything has been informal. Ecology reads the comments it gets, but it isn’t required to answer them. The CR-102 changes that.

•     Proposed rule text. Ecology files the proposed language and its supporting analysis, and the notice is published in the Washington State Register.

•     A formal comment period. Comments submitted in that window become part of the official rulemaking record.

•     Public hearings. Ecology’s schedule lists them for spring 2027.

•     A written response. Before it adopts the rule, Ecology has to publish a statement that summarizes the comments it received and responds to them by subject.

That last step is why the formal comments are the ones that count most.

What you can do now

•     Read the sections that touch your operation. The August drafts and Ecology’s overview table are on Ecology’s rulemaking page. WSMC’s Rule Tracker follows each topic.

•     Know who to call. The informal comment period has closed, but Ecology’s rulemaking staff are still reachable at SpillsRuleMaking@ecy.wa.gov or 360-407-6351. The rulemaking lead is now Alex Colletti.

•     Get on Ecology’s mailing list. That’s how the CR-102 filing and the hearing dates will be announced.

•     Tell me what concerns you.

WSMC will file formal comments when the proposal comes out. If a section would change how you operate, I want to hear it before then.

Dan Smiley

dansmiley@wsmcoop.org

Next
Next

Who needs a mariner’s credential to fight an oil spill?